The redevelopment work of the Kanpur Central Railway Station goes at a quick tempo. With the revamp work at full circulate, the Ministry of Railways on Sunday launched the proposed design of the railway station. Notably, whereas Rs 12,000 crore was handed by the federal government in the course of the 2022-23 rail price range, for the redevelopment of the stations together with Prayagraj and Kanpur, the ministry allotted Rs 368 crore for the redevelopment of Kanpur Central.
The firm that’s given the accountability to redevelop the station shall be required to finish the work in 18 months, media studies stated.
Reports additionally quoted NCR Region CPRO Dr Shivam Sharma as saying that the station shall be redeveloped as per the mannequin ready by the Indian Railway Station Development Authority (IRSDA). He additional knowledgeable that as per the deliberate venture , a multi-storey automotive parking, a three-storey lodge, a shopping center with seating area for near 1500 passengers shall be developed on the central station. Apart from these, a LED TV shall be put in whereas a self-service restaurant can even be opened.
According to studies, two extra foot overbridges shall be constructed on the Kanpur station. After the completion of those two, there shall be a complete of six overbridges on the station. Also, there shall be separate paths for the passengers coming and going out of the station. Kanpur Central Station director Himanshu Shekhar additionally identified that 6345 sq. meters of air area space can even be developed on the station.
Apart from these, the venture can even join the town aspect and cant aspect of the central station shall be linked to the brand new foot overbridge that’s but to be constructed.
Source: www.financialexpress.com”